Real-Time Execution Monitoring with Callbacks

This notebook demonstrates how to use execution callbacks for real-time monitoring of HEC-RAS plan execution.

What you'll learn: - ConsoleCallback for basic output - FileLoggerCallback for logging to file - ProgressBarCallback with tqdm - SynchronizedCallback for thread safety - Creating custom callbacks

Python
from pathlib import Path
import sys
import os

# Flexible imports
try:
    from ras_commander import init_ras_project, RasCmdr, RasExamples, ExecutionCallback
    from ras_commander.callbacks import ConsoleCallback, FileLoggerCallback, ProgressBarCallback, SynchronizedCallback
except ImportError:
    parent_directory = Path(os.getcwd()).parent
    sys.path.append(str(parent_directory))
    from ras_commander import init_ras_project, RasCmdr, RasExamples, ExecutionCallback
    from ras_commander.callbacks import ConsoleCallback, FileLoggerCallback, ProgressBarCallback, SynchronizedCallback
Python
project_path = RasExamples.extract_project("Muncie", suffix="115_callbacks")
init_ras_project(project_path, "6.6")
Text Only
<ras_commander.RasPrj.RasPrj at 0x1a18e278bf0>

1. ConsoleCallback - Basic Console Output

ConsoleCallback prints HEC-RAS output directly to the console.

Python
print("=== ConsoleCallback Demo ===")
callback = ConsoleCallback(verbose=True)
RasCmdr.compute_plan("01", stream_callback=callback, force_rerun=True)
Text Only
=== ConsoleCallback Demo ===
[Plan 01] Starting execution...


[Plan 01] Command: "<HEC-RAS>\6.6\Ras.exe" -c "<workspace>\examples\example_projects\Muncie_115_callbacks\Muncie.prj" "<workspace>\examples\example_projects\Muncie_115_callbacks\Muncie.p01"


[Plan 01] HEC-RAS - River Analysis System


[Plan 01] Project File:  <workspace>\examples\example_projects\Muncie_115_callbacks\Muncie.prj


[Plan 01] Project Name:  Muncie 2D Flow Area


[Plan 01] Plan Name:     Unsteady Multi  9-SA run


[Plan 01] Short ID:      9-SAs


[Plan 01] Starting Time:   01Jan1900 2400


[Plan 01] Ending Time:     02Jan1900 2400


[Plan 01] ################################################


[Plan 01] #                                              #


[Plan 01] #                                              #


[Plan 01] #       1D and 2D Unsteady Flow Module         #


[Plan 01] #                                              #


[Plan 01] #                                              #


[Plan 01] #          HEC-RAS 6.6 September 2024          #


[Plan 01] #                                              #


[Plan 01] #             11JUN26 at 13:12:14              #


[Plan 01] #                                              #


[Plan 01] ################################################


[Plan 01] Starting Unsteady Flow Computations


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.08333    to     -0.07917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            15696.24   949.27   4.30643  146                941.72   0.00000 White            15696.24    13500     12500


[Plan 01] Solving for Time Window =    -0.08333    to     -0.07917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            15696.24   948.07   1.71231  146                941.72   0.00000 White            15485.51     3254       156


[Plan 01] Solving for Time Window =    -0.08333    to     -0.07917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            15696.24   947.57   0.70744  146                941.72   0.00000 White            15485.51     3903       928


[Plan 01] Solving for Time Window =    -0.08333    to     -0.07917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            15696.24   947.39   0.26155  146                941.72   0.00000 White            15485.51     4399       708


[Plan 01] Solving for Time Window =    -0.08333    to     -0.07917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 4 White


[Plan 01] 4 White            15370.43   945.59   0.06937  146                941.72   0.00000 White            15485.51     4686       410


[Plan 01] Solving for Time Window =    -0.08333    to     -0.07917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 5 White


[Plan 01] 5 White            15370.43   945.61   0.02494  146                941.72   0.00000 White            15485.51     4786       143


[Plan 01] Solving for Time Window =    -0.08333    to     -0.07917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 6 White


[Plan 01] 6 White            15370.43   945.61   0.00863  146                941.72   0.00000 White            15485.51     4820        49


[Plan 01] White            Muncie


[Plan 01] Riv. Sta.   Q Diff.    Q Backwater  Q TimeStep            Z Diff.   Z Backwater Z TimeStep


[Plan 01] 15696.24  -12500.00        1000.00    13500.00              -2.37        944.96     947.34


[Plan 01] 15485.51   -3820.32        1000.00     4820.32              -1.07        944.92     945.99


[Plan 01] 15370.43   -1769.37        1000.00     2769.37              -0.71        944.90     945.61


[Plan 01] 15205.29    -465.19        1000.00     1465.19              -0.28        944.61     944.89


[Plan 01] These differences may, for some data sets, cause instability in the model.  They are often caused by


[Plan 01] discrepancies between the values entered for initial conditions and the values on the boundary


[Plan 01] hydrographs.  For instance, for the upstream end of a reach the flow for time = 0.0 on the hydrograph may


[Plan 01] not match the flow in the initial condition.  A difference at an internal cross section may be caused by


[Plan 01] a lateral diversion (e.g. lateral weir), that is not represented in the initial condition flows.


[Plan 01] For some data sets (such as those with lateral weirs), turning Flow Optimization on may help.


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0792 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    947.34   13500.   7.25


[Plan 01] 237.6455    920.27    1003.   2.23


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.07917    to     -0.07500 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            15485.51   947.49   1.50087  146                941.72   0.00000 White            15485.51     9327      4507


[Plan 01] Solving for Time Window =    -0.07917    to     -0.07500 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            15485.51   947.21   0.40251  146                941.72   0.00000 White            15205.29     3068       251


[Plan 01] Solving for Time Window =    -0.07917    to     -0.07500 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            15485.51   947.13   0.11911  146                941.72   0.00000 White            15205.29     3152       120


[Plan 01] Solving for Time Window =    -0.07917    to     -0.07500 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            15696.24   947.86   0.05721  146                941.72   0.00000 White            15485.51     9108        64


[Plan 01] Solving for Time Window =    -0.07917    to     -0.07500 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 4 White


[Plan 01] 4 White            15696.24   947.88   0.02534  146                941.72   0.00000 White            15485.51     9082        37


[Plan 01] Solving for Time Window =    -0.07917    to     -0.07500 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 5 White


[Plan 01] 5 White            15696.24   947.89   0.01049  146                941.72   0.00000 White            15485.51     9069        18


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0750 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    947.89   13500.   6.48


[Plan 01] 237.6455    920.27    1003.   2.24


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.07500    to     -0.07083 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            15370.43   947.72   0.96271  146                941.72   0.00000 White            15205.29     5377      2189


[Plan 01] Solving for Time Window =    -0.07500    to     -0.07083 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            15205.29   946.45   0.14696  146                941.72   0.00000 White            15485.51    10287       228


[Plan 01] Solving for Time Window =    -0.07500    to     -0.07083 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            15205.29   946.41   0.05566  146                941.72   0.00000 White            15485.51    10209       111


[Plan 01] Solving for Time Window =    -0.07500    to     -0.07083 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            15205.29   946.39   0.02487  146                941.72   0.00000 White            15370.43     8040        54


[Plan 01] Solving for Time Window =    -0.07500    to     -0.07083 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 4 White


[Plan 01] 4 White            15205.29   946.39   0.01060  146                941.72   0.00000 White            15370.43     8023        24


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0708 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    948.32   13500.   5.92


[Plan 01] 237.6455    920.28    1004.   2.24


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.07083    to     -0.06667 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            15013.20   945.85   0.80375  146                941.72   0.00000 White            15205.29     7003      1673


[Plan 01] Solving for Time Window =    -0.07083    to     -0.06667 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            15013.20   945.77   0.12320  146                941.72   0.00000 White            15485.51    10641       103


[Plan 01] Solving for Time Window =    -0.07083    to     -0.06667 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14856.24   944.17   0.03858  146                941.72   0.00000 White            15485.51    10591        71


[Plan 01] Solving for Time Window =    -0.07083    to     -0.06667 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            14856.24   944.16   0.01339  146                941.72   0.00000 White            15370.43     8996        28


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0667 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    948.74   13500.   5.46


[Plan 01] 237.6455    920.28    1005.   2.24


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.06667    to     -0.06250 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14917.36   945.78   0.75810  146                941.72   0.00000 White            15013.20     5437      1381


[Plan 01] Solving for Time Window =    -0.06667    to     -0.06250 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14856.24   944.70   0.12485  146                941.72   0.00000 White            15485.51    10961       126


[Plan 01] Solving for Time Window =    -0.06667    to     -0.06250 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14856.24   944.66   0.06329  146                941.72   0.00000 White            15485.51    10933        41


[Plan 01] Solving for Time Window =    -0.06667    to     -0.06250 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            14856.24   944.64   0.02471  146                941.72   0.00000 White            14917.36     4136        21


[Plan 01] Solving for Time Window =    -0.06667    to     -0.06250 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 4 White


[Plan 01] 4 White            14856.24   944.63   0.01261  146                941.72   0.00000 White            14917.36     4129        10


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0625 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    949.13   13500.   5.06


[Plan 01] 237.6455    920.29    1007.   2.24


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.06250    to     -0.05833 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14787.40   945.41   0.70116  146                941.72   0.00000 White            14917.36     5384      1255


[Plan 01] Solving for Time Window =    -0.06250    to     -0.05833 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14856.24   945.13   0.13401  146                941.72   0.00000 White            15013.20     6458       141


[Plan 01] Solving for Time Window =    -0.06250    to     -0.05833 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14856.24   945.09   0.05454  146                941.72   0.00000 White            15370.43    10413        57


[Plan 01] Solving for Time Window =    -0.06250    to     -0.05833 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            14856.24   945.06   0.04021  146                941.72   0.00000 White            15013.20     6421        70


[Plan 01] Solving for Time Window =    -0.06250    to     -0.05833 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 4 White


[Plan 01] 4 White            14917.36   946.37   0.02435  146                941.72   0.00000 White            15013.20     6458        54


[Plan 01] Solving for Time Window =    -0.06250    to     -0.05833 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 5 White


[Plan 01] 5 White            15205.29   947.89   0.01984  146                941.72   0.00000 White            15013.20     6419        56


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0583 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    949.48   13500.   4.76


[Plan 01] 237.6455    920.30    1012.   2.24


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.05833    to     -0.05417 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14535.60   945.09   0.68199  146                941.72   0.00000 White            14856.24     5936      1143


[Plan 01] Solving for Time Window =    -0.05833    to     -0.05417 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14856.24   945.48   0.07612  146                941.72   0.00000 White            15013.20     7268       186


[Plan 01] Solving for Time Window =    -0.05833    to     -0.05417 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14856.24   945.46   0.03059  146                941.72   0.00000 White            15013.20     7224        63


[Plan 01] Solving for Time Window =    -0.05833    to     -0.05417 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            14856.24   945.45   0.01218  146                941.72   0.00000 White            14917.36     6219        22


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0542 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    949.76   13500.   4.53


[Plan 01] 237.6455    920.31    1018.   2.24


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.05417    to     -0.05000 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14535.60   945.76   0.68166  146                941.72   0.00000 White            14856.24     6739       923


[Plan 01] Solving for Time Window =    -0.05417    to     -0.05000 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14305.48   943.78   0.06295  146                941.72   0.00000 White            15205.29    10044        96


[Plan 01] Solving for Time Window =    -0.05417    to     -0.05000 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14305.48   943.75   0.03001  146                941.72   0.00000 White            15205.29    10068        34


[Plan 01] Solving for Time Window =    -0.05417    to     -0.05000 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            14305.48   943.74   0.01416  146                941.72   0.00000 White            15205.29    10076        11


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0500 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    949.98   13500.   4.36


[Plan 01] 237.6455    920.33    1024.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.05000    to     -0.04583 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14535.60   946.37   0.63600  146                941.72   0.00000 White            14443.72     4612       863


[Plan 01] Solving for Time Window =    -0.05000    to     -0.04583 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14305.48   944.22   0.05980  146                941.72   0.00000 White            14535.60     5210        65


[Plan 01] Solving for Time Window =    -0.05000    to     -0.04583 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14305.48   944.20   0.02740  146                941.72   0.00000 White            15013.20     8674        22


[Plan 01] Solving for Time Window =    -0.05000    to     -0.04583 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            14305.48   944.19   0.01281  146                941.72   0.00000 White            15013.20     8668         9


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0458 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    950.17   13500.   4.23


[Plan 01] 237.6455    920.35    1030.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.04583    to     -0.04167 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14535.60   946.91   0.57043  146                941.72   0.00000 White            14443.72     5377       819


[Plan 01] Solving for Time Window =    -0.04583    to     -0.04167 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   942.86   0.07227  146                941.72   0.00000 White            14039.64     3310        67


[Plan 01] Solving for Time Window =    -0.04583    to     -0.04167 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14305.48   944.64   0.02198  146                941.72   0.00000 White            14166.05     3896        21


[Plan 01] Solving for Time Window =    -0.04583    to     -0.04167 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            14305.48   944.63   0.01121  146                941.72   0.00000 White            14443.72     5336         8


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0417 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    950.33   13500.   4.12


[Plan 01] 237.6455    920.36    1034.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.04167    to     -0.03750 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14166.05   945.17   0.53884  146                941.72   0.00000 White            14443.72     6109       772


[Plan 01] Solving for Time Window =    -0.04167    to     -0.03750 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   943.05   0.07820  146                941.72   0.00000 White            13859.04     3669        35


[Plan 01] Solving for Time Window =    -0.04167    to     -0.03750 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14039.64   943.02   0.03671  146                941.72   0.00000 White            14917.36     9235        28


[Plan 01] Solving for Time Window =    -0.04167    to     -0.03750 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            14039.64   943.01   0.01561  146                941.72   0.00000 White            14039.64     3994        15


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0375 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    950.47   13500.   4.03


[Plan 01] 237.6455    920.37    1037.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.03750    to     -0.03333 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14166.05   945.68   0.50612  146                941.72   0.00000 White            14039.64     4793       799


[Plan 01] Solving for Time Window =    -0.03750    to     -0.03333 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   943.18   0.06924  146                941.72   0.00000 White            14166.05     5325        93


[Plan 01] Solving for Time Window =    -0.03750    to     -0.03333 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14039.64   943.16   0.02621  146                941.72   0.00000 White            14039.64     4705        39


[Plan 01] Solving for Time Window =    -0.03750    to     -0.03333 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            14856.24   947.66   0.01221  146                941.72   0.00000 White            14039.64     4694        15


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0333 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    950.60   13500.   3.94


[Plan 01] 237.6455    920.37    1039.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00




[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.03333    to     -0.02917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14166.05   946.21   0.48128  146                941.72   0.00000 White            14039.64     5483       789


[Plan 01] Solving for Time Window =    -0.03333    to     -0.02917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   943.31   0.07703  146                941.72   0.00000 White            14166.05     5957       142


[Plan 01] Solving for Time Window =    -0.03333    to     -0.02917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14856.24   948.05   0.02572  146                941.72   0.00000 White            14166.05     5928        41


[Plan 01] Solving for Time Window =    -0.03333    to     -0.02917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            14856.24   948.06   0.01310  146                941.72   0.00000 White            14039.64     5352        15


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0292 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    950.73   13500.   3.87


[Plan 01] 237.6455    920.38    1041.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00




[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.02917    to     -0.02500 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14166.05   946.66   0.42801  146                941.72   0.00000 White            14039.64     6078       727


[Plan 01] Solving for Time Window =    -0.02917    to     -0.02500 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   943.42   0.06964  146                941.72   0.00000 White            14039.64     6006       104


[Plan 01] Solving for Time Window =    -0.02917    to     -0.02500 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14039.64   943.40   0.02890  146                941.72   0.00000 White            14039.64     5969        53


[Plan 01] Solving for Time Window =    -0.02917    to     -0.02500 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            14443.72   947.59   0.01324  146                941.72   0.00000 White            14039.64     5955        20


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0250 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    950.84   13500.   3.80


[Plan 01] 237.6455    920.38    1042.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.02500    to     -0.02083 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14166.05   947.06   0.37243  146                941.72   0.00000 White            14039.64     6647       692


[Plan 01] Solving for Time Window =    -0.02500    to     -0.02083 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   943.51   0.06316  146                941.72   0.00000 White            14166.05     7057       119


[Plan 01] Solving for Time Window =    -0.02500    to     -0.02083 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14305.48   946.79   0.02418  146                941.72   0.00000 White            14039.64     6535        49


[Plan 01] Solving for Time Window =    -0.02500    to     -0.02083 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            14443.72   947.83   0.01217  146                941.72   0.00000 White            14039.64     6522        18


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0208 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    950.95   13500.   3.73


[Plan 01] 237.6455    920.38    1042.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.02083    to     -0.01667 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14166.05   947.44   0.33505  146                941.72   0.00000 White            14039.64     7158       636


[Plan 01] Solving for Time Window =    -0.02083    to     -0.01667 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   943.59   0.05382  146                941.72   0.00000 White            14166.05     7523       114


[Plan 01] Solving for Time Window =    -0.02083    to     -0.01667 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14305.48   947.17   0.02160  146                941.72   0.00000 White            14039.64     7053        45


[Plan 01] Solving for Time Window =    -0.02083    to     -0.01667 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 3 White


[Plan 01] 3 White            14305.48   947.18   0.00908  146                941.72   0.00000 White            14039.64     7041        16


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0167 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    951.06   13500.   3.68


[Plan 01] 237.6455    920.38    1042.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.01667    to     -0.01250 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14166.05   947.78   0.29441  146                941.72   0.00000 White            14039.64     7619       577


[Plan 01] Solving for Time Window =    -0.01667    to     -0.01250 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   943.67   0.04827  146                941.72   0.00000 White            14166.05     7933       114


[Plan 01] Solving for Time Window =    -0.01667    to     -0.01250 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14305.48   947.51   0.01946  146                941.72   0.00000 White            14039.64     7519        41


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0125 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    951.16   13500.   3.62


[Plan 01] 237.6455    920.38    1042.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.01250    to     -0.00833 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14305.48   947.77   0.26213  146                941.72   0.00000 White            14039.64     8023       504


[Plan 01] Solving for Time Window =    -0.01250    to     -0.00833 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   943.74   0.03931  146                941.72   0.00000 White            14166.05     8302        93


[Plan 01] Solving for Time Window =    -0.01250    to     -0.00833 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14305.48   947.80   0.01633  146                941.72   0.00000 White            14039.64     7939        35


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0083 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    951.25   13500.   3.57


[Plan 01] 237.6455    920.38    1042.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.00833    to     -0.00417 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14305.48   948.03   0.23052  146                941.72   0.00000 White            14039.64     8390       450


[Plan 01] Solving for Time Window =    -0.00833    to     -0.00417 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   943.81   0.04188  146                941.72   0.00000 White            14166.05     8624        98


[Plan 01] Solving for Time Window =    -0.00833    to     -0.00417 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14039.64   943.80   0.01687  146                941.72   0.00000 White            14166.05     8598        37


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =     -0.0042 HOURS -  1/ 1/1900 AT TIME   0:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    951.35   13500.   3.52


[Plan 01] 237.6455    920.38    1042.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =    -0.00417    to      0.00000 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14305.48   948.26   0.20236  146                941.72   0.00000 White            13214.80     4062       409




[Plan 01] Solving for Time Window =    -0.00417    to      0.00000 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   943.87   0.02926  146                941.72   0.00000 White            14166.05     8917        65


[Plan 01] Solving for Time Window =    -0.00417    to      0.00000 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14039.64   943.86   0.01229  146                941.72   0.00000 White            14039.64     8635        29


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0000 HOURS -  1/ 1/1900 AT TIME  24:00:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    951.45   13500.   3.47


[Plan 01] 237.6455    920.38    1042.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.00000    to      0.00417 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14305.48   948.46   0.17765  146                941.72   0.00000 White            13214.80     4456       395


[Plan 01] Solving for Time Window =     0.00000    to      0.00417 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ




[Plan 01] 1 White


[Plan 01] 1 White            14039.64   943.93   0.02392  146                941.72   0.00000 White            14166.05     9198        49


[Plan 01] Solving for Time Window =     0.00000    to      0.00417 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14039.64   943.92   0.01158  146                941.72   0.00000 White            14166.05     9181        24


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0042 HOURS -  1/ 2/1900 AT TIME  00:00:15


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    951.54   13502.   3.43


[Plan 01] 237.6455    920.38    1041.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.00417    to      0.00833 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14305.48   948.62   0.14988  146                941.72   0.00000 White            13214.80     4840       393


[Plan 01] Solving for Time Window =     0.00417    to      0.00833 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   943.99   0.01872  146                941.72   0.00000 White            14166.05     9457        59


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0083 HOURS -  1/ 2/1900 AT TIME  00:00:30


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    951.63   13504.   3.38


[Plan 01] 237.6455    920.38    1041.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.00833    to      0.01250 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            14443.72   949.33   0.13168  146                941.72   0.00000 White            13214.80     5222       382


[Plan 01] Solving for Time Window =     0.00833    to      0.01250 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   944.05   0.01405  146                941.72   0.00000 White            14166.05     9705        42


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0125 HOURS -  1/ 2/1900 AT TIME  00:00:45


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    951.72   13506.   3.34


[Plan 01] 237.6455    920.38    1041.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.01250    to      0.01667 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            13214.80   942.53   0.12145  146                941.72   0.00000 White            13214.80     5574       359


[Plan 01] Solving for Time Window =     0.01250    to      0.01667 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   944.10   0.02308  146                941.72   0.00000 White            14166.05     9931        49


[Plan 01] Solving for Time Window =     0.01250    to      0.01667 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            14039.64   944.09   0.01176  146                941.72   0.00000 White            14166.05     9913        25


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0167 HOURS -  1/ 2/1900 AT TIME  00:01:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    951.80   13508.   3.30


[Plan 01] 237.6455    920.37    1040.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.01667    to      0.02083 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            12817.36   940.85   0.12531  146                941.72   0.00000 White            13214.80     5898       327




[Plan 01] Solving for Time Window =     0.01667    to      0.02083 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   944.13   0.01536  146                941.72   0.00000 White            14166.05    10130        39


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0208 HOURS -  1/ 2/1900 AT TIME  00:01:15


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    951.88   13510.   3.27


[Plan 01] 237.6455    920.37    1039.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.02083    to      0.02500 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            12817.36   940.98   0.12974  146                941.72   0.00000 White            12817.36     4054       310


[Plan 01] Solving for Time Window =     0.02083    to      0.02500 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   944.18   0.01248  146                941.72   0.00000 White            13214.80     6250        76


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0250 HOURS -  1/ 2/1900 AT TIME  00:01:30


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    951.96   13512.   3.23


[Plan 01] 237.6455    920.37    1039.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00




[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.02500    to      0.02917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            12817.36   941.12   0.13984  146                941.72   0.00000 White            13214.80     6642       391


[Plan 01] Solving for Time Window =     0.02500    to      0.02917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12817.36   941.11   0.01258  146                941.72   0.00000 White            14166.05    10539        24


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0292 HOURS -  1/ 2/1900 AT TIME  00:01:45


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.03   13515.   3.20


[Plan 01] 237.6455    920.37    1038.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.02917    to      0.03333 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            12492.03   940.74   0.14476  146                941.72   0.00000 White            13214.80     7006       362


[Plan 01] Solving for Time Window =     0.02917    to      0.03333 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   944.28   0.00578  146                941.72   0.00000 White            14166.05    10736        18


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0333 HOURS -  1/ 2/1900 AT TIME  00:02:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.10   13517.   3.17


[Plan 01] 237.6455    920.37    1037.   2.26


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00




[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.03333    to      0.03750 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            12492.03   940.90   0.15506  146                941.72   0.00000 White            13214.80     7344       340


[Plan 01] Solving for Time Window =     0.03333    to      0.03750 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   944.33   0.00514  146                941.72   0.00000 White            14166.05    10922        16


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0375 HOURS -  1/ 2/1900 AT TIME  00:02:15


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.17   13519.   3.14


[Plan 01] 237.6455    920.36    1036.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.03750    to      0.04167 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            12492.03   941.06   0.16141  146                941.72   0.00000 White            13214.80     7654       315


[Plan 01] Solving for Time Window =     0.03750    to      0.04167 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            14039.64   944.38   0.00938  146                941.72   0.00000 White            13490.47     9181        31


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0417 HOURS -  1/ 2/1900 AT TIME  00:02:30


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.23   13521.   3.12


[Plan 01] 237.6455    920.36    1035.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.04167    to      0.04583 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            12492.03   941.22   0.16426  146                941.72   0.00000 White            12817.36     5697       327


[Plan 01] Solving for Time Window =     0.04167    to      0.04583 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12227.69   939.51   0.00848  146                941.72   0.00000 White            13214.80     7966        19


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0458 HOURS -  1/ 2/1900 AT TIME  00:02:45


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.29   13523.   3.09


[Plan 01] 237.6455    920.36    1035.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.04583    to      0.05000 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            12492.03   941.39   0.16994  146                941.72   0.00000 White            12817.36     6018       317


[Plan 01] Solving for Time Window =     0.04583    to      0.05000 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12227.69   939.64   0.01268  146                941.72   0.00000 White            12492.03     3682        17


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0500 HOURS -  1/ 2/1900 AT TIME  00:03:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.35   13525.   3.07


[Plan 01] 237.6455    920.36    1034.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q




[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.05000    to      0.05417 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            12492.03   941.56   0.17277  146                941.72   0.00000 White            12817.36     6311       292


[Plan 01] Solving for Time Window =     0.05000    to      0.05417 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12227.69   939.76   0.00721  146                941.72   0.00000 White            12492.03     3937        16


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0542 HOURS -  1/ 2/1900 AT TIME  00:03:15


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.40   13527.   3.05


[Plan 01] 237.6455    920.35    1033.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.05417    to      0.05833 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            12492.03   941.73   0.17389  146                941.72   0.00000 White            12817.36     6568       259


[Plan 01] Solving for Time Window =     0.05417    to      0.05833 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12227.69   939.88   0.01333  146                941.72   0.00000 White            12817.36     6574         9


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0583 HOURS -  1/ 2/1900 AT TIME  00:03:30


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.45   13529.   3.03


[Plan 01] 237.6455    920.35    1032.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.05833    to      0.06250 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            12492.03   941.90   0.16911  146                941.72   0.00000 White            12492.03     4480       284


[Plan 01] Solving for Time Window =     0.05833    to      0.06250 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12227.69   940.01   0.00825  146                941.72   0.00000 White            12492.03     4466        20


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0625 HOURS -  1/ 2/1900 AT TIME  00:03:45


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.50   13531.   3.01


[Plan 01] 237.6455    920.35    1031.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.06250    to      0.06667 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            12492.03   942.07   0.16469  146                941.72   0.00000 White            12492.03     4743       276


[Plan 01] Solving for Time Window =     0.06250    to      0.06667 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12117.14   939.59   0.01075  146                941.72   0.00000 White            12492.03     4726        23


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0667 HOURS -  1/ 2/1900 AT TIME  00:04:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.54   13533.   3.00


[Plan 01] 237.6455    920.35    1030.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.06667    to      0.07083 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            12492.03   942.23   0.16147  146                941.72   0.00000 White            12227.69     3726       272


[Plan 01] Solving for Time Window =     0.06667    to      0.07083 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12117.14   939.73   0.00598  146                941.72   0.00000 White            12492.03     4971        19


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0708 HOURS -  1/ 2/1900 AT TIME  00:04:15


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.58   13535.   2.98


[Plan 01] 237.6455    920.34    1029.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.07083    to      0.07500 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            11958.11   939.78   0.16415  146                941.72   0.00000 White            12227.69     3988       268


[Plan 01] Solving for Time Window =     0.07083    to      0.07500 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12117.14   939.87   0.01553  146                941.72   0.00000 White            11781.69     2898        17


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0750 HOURS -  1/ 2/1900 AT TIME  00:04:30


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.62   13538.   2.97


[Plan 01] 237.6455    920.34    1028.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.07500    to      0.07917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            11958.11   939.93   0.15689  146                941.72   0.00000 White            12227.69     4308       311


[Plan 01] Solving for Time Window =     0.07500    to      0.07917 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12117.14   940.01   0.01193  146                941.72   0.00000 White            12492.03     5507        18


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0792 HOURS -  1/ 2/1900 AT TIME  00:04:45


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.65   13540.   2.95


[Plan 01] 237.6455    920.34    1027.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.07917    to      0.08333 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White




[Plan 01] 0 White            11958.11   940.09   0.16484  146                941.72   0.00000 White            12227.69     4603       301


[Plan 01] Solving for Time Window =     0.07917    to      0.08333 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12117.14   940.15   0.00827  146                941.72   0.00000 White            12492.03     5770        13


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0833 HOURS -  1/ 2/1900 AT TIME  00:05:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.69   13542.   2.94


[Plan 01] 237.6455    920.34    1026.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.08333    to      0.08750 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            11958.11   940.26   0.16455  146                941.72   0.00000 White            12227.69     4889       292


[Plan 01] Solving for Time Window =     0.08333    to      0.08750 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12117.14   940.28   0.02153  146                941.72   0.00000 White            11781.69     3617        27


[Plan 01] Solving for Time Window =     0.08333    to      0.08750 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 2 White


[Plan 01] 2 White            12117.14   940.28   0.00710  146                941.72   0.00000 White            11781.69     3612         7


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0875 HOURS -  1/ 2/1900 AT TIME  00:05:15


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.72   13544.   2.93


[Plan 01] 237.6455    920.33    1025.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.08750    to      0.09167 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            11958.11   940.39   0.15294  146                941.72   0.00000 White            12227.69     5201       319


[Plan 01] Solving for Time Window =     0.08750    to      0.09167 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12117.14   940.41   0.00912  146                941.72   0.00000 White            12817.36     8195        10


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0917 HOURS -  1/ 2/1900 AT TIME  00:05:30


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.74   13546.   2.92


[Plan 01] 237.6455    920.33    1024.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.09167    to      0.09583 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            11958.11   940.55   0.16005  146                941.72   0.00000 White            12227.69     5506       311


[Plan 01] Solving for Time Window =     0.09167    to      0.09583 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12117.14   940.55   0.01277  146                941.72   0.00000 White            11628.65     3748        19


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.0958 HOURS -  1/ 2/1900 AT TIME  00:05:45


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] 15696.24    952.77   13548.   2.91


[Plan 01] 237.6455    920.33    1024.   2.25


[Plan 01] Storage Areas


[Plan 01] NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q    NAME           ELEVATION      NET Q


[Plan 01] 146               941.72       0.00    148               942.72       0.00    150               938.13       0.00


[Plan 01] 152               936.80       0.00    154               937.06       0.00    156               939.46       0.00


[Plan 01] 159               925.02       0.00    160               936.28       0.00    161               937.94       0.00


[Plan 01] Lateral Weirs


[Plan 01] RIVER            STATION      QTOTAL      QWEIR    QGATE     QCULVERT  SUBMERGENCE      Q PER CROSS SECTION


[Plan 01] White            13214                  0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00


[Plan 01] White            7300                   0.00       0.00       0.00       0.00   0.000         0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00        0.00


[Plan 01] SA Connections


[Plan 01] NAME                          QTOTAL      QWEIR      QGATE   SUBMERGENCE    QPIPING


[Plan 01] 162                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 163                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 164                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 165                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 166                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 167                             0.00       0.00       0.00    0.000         0.00




[Plan 01] 168                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 169                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 180                             0.00       0.00       0.00    0.000         0.00


[Plan 01] 181                             0.00       0.00       0.00    0.000         0.00


[Plan 01] ***   Start of New Time Step   ***


[Plan 01] Solving for Time Window =     0.09583    to      0.10000 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 0 White


[Plan 01] 0 White            11958.11   940.71   0.15602  146                941.72   0.00000 White            12117.14     5571       295


[Plan 01] Solving for Time Window =     0.09583    to      0.10000 Hours


[Plan 01] Iter  River          Station    Elev       DZ     Storage            Zsa        DZsa    River          Station         Q        DQ


[Plan 01] 1 White


[Plan 01] 1 White            12117.14   940.68   0.01505  146                941.72   0.00000 White            11781.69     4377        24


[Plan 01] COMPUTED STAGES AND DISCHARGES AT T =      0.1000 HOURS -  1/ 2/1900 AT TIME  00:06:00


[Plan 01] White            Muncie


[Plan 01] Riv. Station     Z        Q      V        Riv. Station     Z        Q      V        Riv. Station     Z        Q      V


[Plan 01] SUCCESS in 16.6s





ComputeResult(SUCCESS, results_df_row=available)

2. FileLoggerCallback - Logging to File

FileLoggerCallback writes execution messages to a log file.

Python
print("=== FileLoggerCallback Demo ===")
log_dir = project_path / "logs_115"
callback = FileLoggerCallback(output_dir=log_dir)
RasCmdr.compute_plan("01", stream_callback=callback, force_rerun=True)

# Show log contents
print(f"\nLog directory created: {log_dir}")
if log_dir.exists():
    for log_file in log_dir.iterdir():
        print(f"Log file: {log_file.name} ({log_file.stat().st_size} bytes)")
Text Only
=== FileLoggerCallback Demo ===



Log directory created: <workspace>\examples\example_projects\Muncie_115_callbacks\logs_115
Log file: plan_01_execution.log (420739 bytes)

3. ProgressBarCallback - Progress Bars with tqdm

ProgressBarCallback displays a progress bar during execution (requires tqdm).

Python
print("=== ProgressBarCallback Demo ===")
try:
    callback = ProgressBarCallback()
    RasCmdr.compute_plan("01", stream_callback=callback, force_rerun=True)
except ImportError:
    print("⚠️ tqdm not installed - install with: pip install tqdm")
Text Only
=== ProgressBarCallback Demo ===

4. Custom Callback - Implementing Your Own

Create custom callbacks by subclassing ExecutionCallback.

Python
class MyCustomCallback(ExecutionCallback):
    """Custom callback that counts messages by type."""

    def __init__(self):
        super().__init__()
        self.message_counts = {"info": 0, "warning": 0, "error": 0}

    def on_exec_message(self, plan_number: str, message: str):
        """Called when HEC-RAS outputs a message."""
        # Count message types
        msg_lower = message.lower()
        if "error" in msg_lower:
            self.message_counts["error"] += 1
        elif "warning" in msg_lower:
            self.message_counts["warning"] += 1
        else:
            self.message_counts["info"] += 1

    def on_exec_complete(self, plan_number: str, success: bool, duration: float):
        """Called when execution completes."""
        print(f"\n=== Execution Summary (Plan {plan_number}) ===")
        print(f"Success: {success}, Duration: {duration:.1f}s")
        print(f"Info messages: {self.message_counts['info']}")
        print(f"Warnings: {self.message_counts['warning']}")
        print(f"Errors: {self.message_counts['error']}")

# Use custom callback
print("=== Custom Callback Demo ===")
callback = MyCustomCallback()
RasCmdr.compute_plan("01", stream_callback=callback, force_rerun=True)
Text Only
=== Custom Callback Demo ===



=== Execution Summary (Plan 01) ===
Success: True, Duration: 15.0s
Info messages: 3256
Warnings: 0
Errors: 0





ComputeResult(SUCCESS, results_df_row=available)

5. SynchronizedCallback - Thread-Safe for Parallel Execution

When running multiple plans in parallel, use SynchronizedCallback for thread safety.

Python
print("=== SynchronizedCallback Demo (Parallel Execution) ===")
base_callback = ConsoleCallback(verbose=True)
callback = SynchronizedCallback(base_callback)

# Run multiple plans in parallel with thread-safe callback
results = RasCmdr.compute_parallel(
    plan_number=["01", "02"],
    max_workers=2,
    force_rerun=True
)
Text Only
=== SynchronizedCallback Demo (Parallel Execution) ===

Summary

You've learned how to use: - ConsoleCallback: Basic console output - FileLoggerCallback: Log to file - ProgressBarCallback: Progress bars (requires tqdm) - Custom callbacks: Implement ExecutionCallback - SynchronizedCallback: Thread-safe wrapper for parallel execution

See the ras-commander documentation for more details on the callback system.